Photo: Central Park
This 30-floor serviced apartment development is a landmark project, and waterproofing is a critical aspect to ensure its durability and functionality over time.
Scope of Work
The waterproofing work for this project covered both internal and external areas, providing comprehensive protection against water damage:
Internal Areas: Toilets, balconies, and yards
External Areas: Flat roofs, podiums, swimming pools, and water tanks
Progress Photos
1. Toilet Waterproofing
Waterproofing was applied to ensure moisture resistance, providing effective protection for the toilet areas.
Photo: Waterproofing application in progress for the toilet area.
2. Balcony Waterproofing
A waterproofing system was installed on the balcony to ensure durability and prevent water infiltration.
Photo: Waterproofing layer applied to the balcony area.
3. Podium Waterproofing
The podium area was treated with a reliable waterproofing solution to maintain structural integrity and protection.
Photo: Podium waterproofing work in progress.
4. Flat Roof Waterproofing
The flat roof was waterproofed to provide lasting protection against environmental exposure and water leakage.
Photo: Flat roof waterproofing during application.
5. Water Tank Waterproofing
The water tank was waterproofed to prevent leaks and ensure long-term functionality.
Photo: Completed waterproofing for the water tank.
6. Swimming Pool Waterproofing
Waterproofing was applied to the swimming pool to prevent seepage and maintain performance over time.
Photo: Waterproofing work in progress for the swimming pool.